Soooo, the Minor Variance request did not advance through the system as the applicant might have hoped:
This has resulted in a resubmission...........when denied 35s via SPA, appeal to the OLT, when denied 40s, via Minor Variance, while the SPA is under appeal, resubmit for 50s!
Chutzphah has rarely been better defined.
As long as we're going to reopen the can of worms...............lets nix that fake park that's less than 5M wide (or 1/3 less wide than my apartment) LOL. Come on now, if everything's back on the table, I want an offsite acquisition, at a more than 40% height increase from the original proposal, I also want parkland worth 40% more, plus inflation adjustment. Just saying....
New AIC Link:
Ahead of the renders, @Paclo is flagged.
Also PE will be happy to know:
There are now 4 cabs in the plan.
Renders:
Soooo, the Minor Variance request did not advance through the system as the applicant might have hoped:
This has resulted in a resubmission...........when denied 35s via SPA, appeal to the OLT, when denied 40s, via Minor Variance, while the SPA is under appeal, resubmit for 50s!
Chutzphah has rarely been better defined.
As long as we're going to reopen the can of worms...............lets nix that fake park that's less than 5M wide (or 1/3 less wide than my apartment) LOL. Come on now, if everything's back on the table, I want an offsite acquisition, at a more than 40% height increase from the original proposal, I also want parkland worth 40% more, plus inflation adjustment. Just saying....
New AIC Link:
Application Details
www.toronto.ca
Ahead of the renders, @Paclo is flagged.
Also PE will be happy to know:
3 cabs for 330 units. Pretty good. It's an abnormally small plate so I doubt an extra shaft would even be possible. Even better that they're taking 25 spaces out here, it's literally 50m from St. Clair station.
There are now 4 cabs in the plan.