JamesKoole
Active Member
Seeing the slab get poured and then the first below ground levels starting to come up and eventually reaching grade is going to take this from ho-hum (but interesting) to the next level of excitement.
Didn't they say they need the gigantic crane only to lift the huge pieces equipment (drilling machine). Now that it's gone, there may not be a need in such a large crane, so they will erect a smaller, more traditional crane instead.The yellow structure does look like a crane base but not sure why they need it.
View attachment 192887
The are some massive steel members from ground floor to level 5 that the gigantic crane with its lifting capacity needs to pick before it comes down. The other crane is definitely working on the south podium as things speed up for the below grade construction.Didn't they say they need the gigantic crane only to lift the huge pieces equipment (drilling machine). Now that it's gone, there may not be a need in such a large crane, so they will erect a smaller, more traditional crane instead.