The last of these huge beams has arrived still on the flatbed.
F5D12530-4828-4C07-823D-95A41239BF51.jpeg
3D9880F9-5EEB-4A1B-AD97-828C8257F823.jpeg
448010C8-CDBB-4920-9CB8-283C6F3DBE64.jpeg
49B5DE02-E949-49E8-B33C-94ED797A5D30.jpeg
BA5AE6A0-3C9F-435D-8F6A-C7886318AC37.jpeg
FB9B2E8E-7409-4130-9686-A2181BE63473.jpeg
CD9C7829-D1D0-4D03-B865-350F09A78820.jpeg
F52A274C-CE25-4B89-91F2-3A158610F644.jpeg
F19455A5-C2DC-4CEB-9BB0-A96AC9807D60.jpeg
81D9C7D4-FCA5-411F-97F0-E4D4DE9C8B2A.jpeg
3EE44807-44AA-4228-BF6F-14E4A65A8206.jpeg
DD39AB51-A346-45B0-822B-A5157D1BA793.jpeg
1CD8215B-0B37-44C3-A1C1-9EB01C1099F4.jpeg
6F627A1E-406B-4E07-9A9C-EA201F2C9A8D.jpeg
 
Last edited:
By the way, I love that they've now installed more campfire benches (seen in the last picture) all along Bloor. The original (roughly IFO the IBM building) is one of my daughter's favourite sites on Bloor at night, and a pleasant surprise for those who aren't expecting it.
 
I'd expect the next step is for the 4 pieces that link each pair of angled support columns to be installed. After which they'd interlock these 4 pieces at the top with more steel. That would be the "Restaurant (Event Space)" floor.

The main super-columns will be much easier to install as there's no balancing act and interlocking required, so it can happen after the angle columns and still be ready at relatively the same time.

There's another group of angle support columns going up from the "Restaurant (Event Space)" floor! They're gonna have to do this jigsaw balancing act further up in the air in a few weeks again!
 

Back
Top