Today.
47B8FACD-652E-4B00-85EE-53B7C646ED04.jpeg
6F5211FE-67AC-46BE-8B45-76C72B278AB5.jpeg
14D33C5C-6845-44FC-8ABA-437B98B8F0A6.jpeg
110D7403-C577-4FB5-9784-E4519B349AF7.jpeg
3EF42040-E89B-4F61-9228-4299D0B6834A.jpeg
206770DF-EB7E-4C08-9502-B9A972F5A6F9.jpeg
FC3D33D9-F725-4C17-9F2C-70315F467992.jpeg
42FBA18B-18AA-4B3E-8CA1-8418E4902C9B.jpeg
 
So interesting to watch...but something tells me we’re going to be sitting on this level for quite a while.

(Thanks for the great pics, as always, @Benito)
 
I give it about 2 weeks until they pour. My concern is for the next 80 floors (and if we are lucky a few more) if they have to pour the entire floor plate in one go I'm thinking it's going to be a minimum of 2 weeks per floor which would put us toping out around the end of 2024. Hoping I'm wrong.
 
Last edited:
Today, from the ground.
7D6A919C-70FD-414D-B84E-A2DFE4BACFE4.jpeg
322D13A9-9413-42AA-A969-B59B1DAD5C40.jpeg
75DD7D3E-7192-4E8E-A719-1A1A0F558308.jpeg
3FFA3C5A-2B9A-477C-B53D-E72FEDC7FBDF.jpeg
0F7A4A6A-EF39-4C95-94DE-5B59854FAB24.jpeg
29CD79E6-B405-45D3-AF12-C19AA543A9E8.jpeg
BBD53246-D3EA-40E5-8379-6040ADFABCB5.jpeg
A1B9242D-EE08-48A3-9F57-52969D00C48D.jpeg
 

Attachments

  • 86EED5E5-68D2-4352-AC24-96582ADDC9A7.jpeg
    86EED5E5-68D2-4352-AC24-96582ADDC9A7.jpeg
    387.5 KB · Views: 134
  • 504A26F7-FB60-46C9-9AA6-FF0FBE76F43C.jpeg
    504A26F7-FB60-46C9-9AA6-FF0FBE76F43C.jpeg
    432.6 KB · Views: 124
  • 0F6E8D68-626F-4FAF-93B8-A8D39AE3B0E9.jpeg
    0F6E8D68-626F-4FAF-93B8-A8D39AE3B0E9.jpeg
    382.5 KB · Views: 165
  • 9422B15C-6CEE-440F-901F-45CD1EEBE97F.jpeg
    9422B15C-6CEE-440F-901F-45CD1EEBE97F.jpeg
    380.5 KB · Views: 131
  • F55114E0-30AD-4967-B8A2-2A90B3432E9B.jpeg
    F55114E0-30AD-4967-B8A2-2A90B3432E9B.jpeg
    390.3 KB · Views: 130
  • 8A44C1F3-CA23-4A76-BBBE-A07BF2E6AC6A.jpeg
    8A44C1F3-CA23-4A76-BBBE-A07BF2E6AC6A.jpeg
    388.9 KB · Views: 132
  • 6586DE06-9DF0-40AA-BAF1-F27FD5D0E0ED.jpeg
    6586DE06-9DF0-40AA-BAF1-F27FD5D0E0ED.jpeg
    342.5 KB · Views: 132
Man, the amount of rebar onsite and in-use at The One is simply mind-boggling! Really explains why the upward movement for this building is so slow! The size and complexity of the rebar framework, especially in the first few floors, really calls for this to be a slow process, lest they screw something up and have to rip it apart.
 

Back
Top