You'd enjoy reading our front page article from back in April.Love to know how many metric tonnes of soil will have been taken out of here once the excavation is done. No doubt they'd have a precise figure.
42
You'd enjoy reading our front page article from back in April.Love to know how many metric tonnes of soil will have been taken out of here once the excavation is done. No doubt they'd have a precise figure.
Ouch. Buuuuusted.
The new crane is for the tallest residential building. It shares a podium with the office tower up until the sixth floor, and then splits into the two separate towers. I believe Ellis Don is building the shared podium but then Deltera will take over for the residential tower.
I find it difficult to believe it is for the east residential tower as well. That excavation is not even done yet. I’m sure someone can post the site plan and it will all be clear.Are you sure it is for the Residential tower? I don't believe we have heard of a sales centre or anything have we? I agree it will be used for the basement and podium levels though.
Please correct me though.
Cheers,
I find it difficult to believe it is for the east residential tower as well. That excavation is not even done yet. I’m sure someone can post the site plan and it will all be clear.