Here is a time lapse video of Building B's damaged crane being removed early Monday morning. Be patient with it. It is an interesting co-ordination of 3 different mobile cranes (one in the hole, two at grade) and logistically impressive. I added music to match but for some reason, it is not currently playing it.

There was nearly 3 days of prep for Del Terra and their crane subs to set up for the few hours I show here, which is the meat of the removal. At the very beginning, you see a crane bucket over the workers to the top of the crane (their headlights flash in the direction of the camera occasionally) to help with the dismantling.

Kudos to the Well construction team. They scrambled when the crane broke on Friday morning and managed to get it all done over a frigid weekend to minimize the disruption to construction progress on the site.

awesome thank you...
 
Pics taken Jan 16, 2019

Looks like the base for crane #8 is in progress.

fullsizeoutput_1f89.jpeg




DSC01615.JPG





fullsizeoutput_1f90.jpeg




fullsizeoutput_1f8a.jpeg




DSC01605.JPG




fullsizeoutput_1f8c.jpeg




DSC01599.JPG




DSC01496.JPG




DSC01497.JPG




fullsizeoutput_1f8f.jpeg
 

Back
Top