drum118
Superstar
I and others have been pushing to get CP into the trench, but not like the one that has been plan.
It's nice to hear that CP is looking at this as they have to respond to the ToR for this area.
There is enough room starting at Eginton to get CP under the various roads that will cross corridor.
The big issue is to the north for CP, at the 401, as there is only enough room for 3 tracks to the 401. There is will be 2 tracks under it, but what will the grade do to the structure for the 401 as well at Wilson.
There will have to be a small underpass at Oak St to keep CP at .8% grade.
This will allow the Bolton line to service Weston without having 2 stations.
Having the Bolton Line stopping at Weston will allow riders to get to/from the airport as well to/from the west.
It's nice to hear that CP is looking at this as they have to respond to the ToR for this area.
There is enough room starting at Eginton to get CP under the various roads that will cross corridor.
The big issue is to the north for CP, at the 401, as there is only enough room for 3 tracks to the 401. There is will be 2 tracks under it, but what will the grade do to the structure for the 401 as well at Wilson.
There will have to be a small underpass at Oak St to keep CP at .8% grade.
This will allow the Bolton line to service Weston without having 2 stations.
Having the Bolton Line stopping at Weston will allow riders to get to/from the airport as well to/from the west.