Just call it Leaside Village. Better name if you ask me.
Just call it Leaside Village. Better name if you ask me.
Correct, the developer revised earlier submissions to the city to exclude Tower C for a future phase 2. You can see it on the architectural drawings, which show Tower C as phase 2.Why does project site only show Tower A (20-storey) and Tower B (16-storey) but not Tower C (28-storey)?
Upper East Village | 75.15m | 21s | Camrost-Felcorp | Arcadis
Update: http://urbantoronto.ca/news/2017/02/densified-redevelopment-plans-evolve-eglinton-east-lairdurbantoronto.ca
Is this project being done in 2 phases with the taller Tower C (28-storey) in phase 2? Personally, I’m hoping it’ll be much taller!
Correct, the developer revised earlier submissions to the city to exclude Tower C for a future phase 2. You can see it on the architectural drawings, which show Tower C as phase 2.