Today. About 6 residential floors to go on both towers.

IMG_0631.JPG


IMG_0632.JPG


IMG_0633.JPG


IMG_0634.JPG


IMG_0635.JPG
 
These towers are now popping up everywhere. Saw them from the parking lot behind Canadian Tire at Yonge & Davenport.
 
Kind of bonkers that this reached grade level in december 2019 and in just over a year it's basically topped out. This flew up.
With 2 towers too. Meanwhile, some single tower projects like 81 Wellesley reached grade around the same time and is only on the 11th floor, and we’re not talking about stalled projects like The One.
 

Back
Top