rbt
Senior Member
Then it's brought back as an option due to the potential extension to Richmond Hill from Finch.
Report says that the TTC would save by not having to build another yard since they could use Wilson which can be massively expanded. The report due point out how it would improve connectivity and the overall network.
Metrolinx quite handily dismissed that as a savings and the RE extension got a large storage area attached to it in its design instead. Savings (versus a train going around Yonge loop) was about $1M per year.
There are good reasons to have Sheppard West, operator savings from out-of-service movements is not one of them.