News   GLOBAL  |  Apr 02, 2020
 9.7K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.5K     0 

As a note, any photos for the new Islington Terminal can only be had by the drome folks as the hole is too far from the street to see what is taking place in it. Only when the terminal hits grade is when you can get shots from the street, The parking lot is total out of the picture for getting shots.
 
Dec 31
The kiss & Ride with cab space has been paved and strip at Kipling, but not open. The fence will remain up around it until all the construction material is removed. Photos for December are on line, but not last night shots.

Don't know when Warden temporary bus bays are to open, but far from doing so as of last night. Try to get some shots, but mostly ended up with rain on them. The walkway from the bus bay area .to the concourse is not completed as well from the street. Only saw 5 shelters with 2 on Warden at the current entrance and may miss a few due to the rain and darkness. The cab with the Kiss & Ride area is ready to open at the south end as well the bus bays as they are paved and strip. Going be some long walks getting to/from the North Parking Lot, the street and the bus bays to/from the subway,

A big different from what I shot early November 27 to yesterday. The gates to the concourse are not fully install and going to be fund funneling riders in both directions through that narrow gate area.

No idea if they will have washrooms in a portal trailer on site since the washrooms will be gone when the new bus bays open, other than going to Kennedy or Victoria Park stations that have washrooms now. If you look out the window of an westbound train, you can see the new area clearly. Daylight the best time to see it.

All the phots from November 27 are now up on my site which is a lot and still running a month behind with a 1,000 still in my backlog including last night shots.

Dec 31
View attachment 622679View attachment 622680View attachment 622681
View attachment 622684

Nov 27
54233746932_26d9a33023_b.jpg

54234881693_0f87f574f9_b.jpg
54234889879_882d2148ec_b.jpg

I was through here this morning and I agree, barring a small miracle I don't foresee the new entrance being open for Sunday.

Even the PPUDO is not cleared of construction materials yet.
 
As a note, any photos for the new Islington Terminal can only be had by the drome folks as the hole is too far from the street to see what is taking place in it. Only when the terminal hits grade is when you can get shots from the street, The parking lot is total out of the picture for getting shots.

@Tim MacDonald took some pics of the site back in early November, I believe, perhaps he would be kind enough to update us.
 
@Tim MacDonald took some pics of the site back in early November, I believe, perhaps he would be kind enough to update us.
I flew near it back in mid-December but there was very little visible change so I didn't take a photo. I'll likely do another fly over and take some photos regardless of progress in the next few weeks - wx permitting of course.
 
I flew near it back in mid-December but there was very little visible change so I didn't take a photo. I'll likely do another fly over and take some photos regardless of progress in the next few weeks - wx permitting of course.

Thanks, Tim.
 
TTC announces changes to bus service at Warden Station as construction of a new, accessible station begins

Jan. 2, 2025

Customers who take a bus to or from Warden Station, Line 2 Bloor Danforth, will soon notice a change in where their bus picks up and drops off. Starting Sun., Jan. 5, the TTC will operate from a new temporary bus terminal and at on-street stops outside the station as the transit agency prepares to construct a modern, accessible bus terminal with two new elevators.

Five conventional bus routes and Wheel-Trans will operate from the new temporary terminal, built on a converted parking lot steps from Warden Station. Six bus routes will pick up and drop off customers at temporary on-street stops on Warden Ave. Fencing and signage will be installed to guide customers from the on-street stops to the subway, with the furthest stop approximately 250 metres from the station entrance.

Bus routes servicing the new temporary terminal include:
• 9 Bellamy
• 16 McCowan
• 17 Birchmount
• 69 Warden South
• 135 Gerrard
• Wheel-Trans

The following routes will service stops on Warden Ave.:
• 8 Broadview
• 68 Warden / 968 Warden Express
• 102 Markham Rd. / 902 Markham Rd. Express
• 117 Birchmount South

69 Warden South and 117 Birchmount South will continue to operate as one longer continuous route between the St. Clair Ave. East/Kingston Rd. area and Victoria Park Station, via Warden Station. Customers may remain on board buses travelling through Warden Station.

Tap for free transfer at Warden Station

Customers transferring between the subway and on-street stops at Warden Station must validate their free transfer by tapping the same PRESTO, debit, or credit card used to start their trip. The TTC provides a two-hour free transfer window from the first tap. If paying by cash, TTC ticket, or token, customers will need to obtain a paper transfer as Proof-of-Payment and show it to the collector when entering the station, or to their bus Operator.

New, modernized Warden Station will be fully accessible

Warden Station will be completely rebuilt as part of the TTC’s Easier Access program to provide a step-free path from street level to all TTC subway platforms. The upgrades at Warden Station will include installing elevators, accessible doors, ramps, wide fare gates, tactile tiles, ceiling and signage modifications, and modern architectural finishes. While reconstruction will take approximately three years to complete, the TTC anticipates elevators will be in service at Warden Station by the end of this year.

Further information about the Warden Station redevelopment can be found on the TTC website at: https://www.ttc.ca/about-the-ttc/projects-and-plans/Warden

This news release, including links, is available at: https://www.ttc.ca/news/2025/January/TTC-announces-changes-to-bus-service-at-Warden-Station
 
Dec 31
The kiss & Ride with cab space has been paved and strip at Kipling, but not open. The fence will remain up around it until all the construction material is removed. Photos for December are on line, but not last night shots.

Don't know when Warden temporary bus bays are to open, but far from doing so as of last night. Try to get some shots, but mostly ended up with rain on them. The walkway from the bus bay area .to the concourse is not completed as well from the street. Only saw 5 shelters with 2 on Warden at the current entrance and may miss a few due to the rain and darkness. The cab with the Kiss & Ride area is ready to open at the south end as well the bus bays as they are paved and strip. Going be some long walks getting to/from the North Parking Lot, the street and the bus bays to/from the subway,

A big different from what I shot early November 27 to yesterday. The gates to the concourse are not fully install and going to be fund funneling riders in both directions through that narrow gate area.

No idea if they will have washrooms in a portal trailer on site since the washrooms will be gone when the new bus bays open, other than going to Kennedy or Victoria Park stations that have washrooms now. If you look out the window of an westbound train, you can see the new area clearly. Daylight the best time to see it.

All the phots from November 27 are now up on my site which is a lot and still running a month behind with a 1,000 still in my backlog including last night shots.

Dec 31
View attachment 622679View attachment 622680View attachment 622681
View attachment 622684

Nov 27
54233746932_26d9a33023_b.jpg

54234881693_0f87f574f9_b.jpg
54234889879_882d2148ec_b.jpg
Warden temp bus bays open Jan5
 

Back
Top