I sometimes think the 504 should have been part of the Canary District build. It might have made more sense for it to veer south at Sumach, run along Front (via a new bridge over the Don), touch East Harbour on the east side, then head north on Broadview. That would leave a short stretch of King without the 504, but it would still be served by the 503. This approach could have eased the interlining bottleneck at Queen/Broadview while effectively linking the 504 with the future Broadview line.
 
An alternative I thought up a while ago, but would require quite intelligent smart traffic lights, is a form of TSP where if a streetcar is behind left turning cars, to give the cars an advanced left to clear out of the way of the streetcar. And the advanced left would only be triggered by a streetcar near the intersection, to not slow down streetcars going the other direction unncessecarily. Basically the purpose of the advanced left would be only for the purpose of getting the left turning cars out of the path of a streetcar.
That's how the signal on Bathurst and Adelaide work on the north leg. The streetcar can extend the signal until the queue is cleared (up to a maximum)
 
Platform Edge Doors are the key move here. For Line 2, that will require ATC.
And many decades...I think we need better (realistic) short term solution if this continues to be a source of significant delay.

Bay station appears to be where spotted at track level, possibly for its' unique setup... Interesting they could not apprehend 3 people who went into the tunnels... Perhaps a start with better surveillance. No pictures of the suspects? Unlike suicide, I imagine trespassing to be less deterred by platform edge doors (at critical locations).
 
Last edited:
From X, ice on a subway car.


G_ta8HcXQAAAtfP.jpeg
 
For the Spadina Streetcar, I recently emailed the mayor and the local counselor Saxe about removing stops and closing intersections and.... got no response. I think there is enough public focus on the slow speed of our streetcars that now is the time to be able to remove some stops on Spadina and get it moving faster.
I didn't get a response from either. Is that normal now? I always received a response from Councillors and Tory's office. What are other's experience?
 
TTC Agenda is up.

No update on Line 5 is posted.

But there is a presentation TSP more broadly. (not yet posted, just a placeholder)


Ugh,

If they do delay the opening again, I can see questions being asked. The TTC would need to some explaining about the delay and get the ball ******* rolling.

You can only say we are working on it so many times before eventually someone says shut the **** up and open the thing.
 
TTC Chair Myers this morning on CBC Metro Morning said that TSP will be implemented by end of May, in a conversation about Line 5's opening date. Figure he meant a more aggressive implementation, but he didn't elaborate. Don't remember if he said it that certainly or if it was hedged with "I believe"... was early and there isn't a way to listen to it again.
 
There is/was a plan for a loop at Queen/Broadview through what is now a Green P Parking lot. That was paused indefinitely. Because why? Which member of Council loves parking more than anything else in life? That's right.....

***

Not sure that would have helped much in this particular case, but its still a good idea. Connecting tracks btw Kingston and Queen via Woodbine, and btw Queen and Gerrard via Carlaw would also make sense. Though, in a world of limited funds, such ideas don't top my list of priorities.
I'm guessing this councillours name rhymes with Faula Pletcher?
 
IMO there is now way they Line 5 is opening in a month they think the temperature might ever dip below 0, after the disaster of Finch. May-Sep always seemed prime for avoiding embarrassing switch failures and juicing those opening day ribbon cutting events.
 
IMO there is now way they Line 5 is opening in a month they think the temperature might ever dip below 0, after the disaster of Finch. May-Sep always seemed prime for avoiding embarrassing switch failures and juicing those opening day ribbon cutting events.
Eglinton uses completely different switch heaters and has been tested in the winter for several years now. I doubt there are any surprises for them here.
 