It is energized. It just took them longer to do it than planned. When the overhead wire was being built towards Downtown late 2020 into 2021 I noticed EPCOR building the overhead down Connors Road into Downtown, while someone else has done the rest of the line. I assume that was to help speed things up.I imagine this wave of Covid could continue into March, depending on vaccinations and severity. I hope that the energizing of the LRT network can be achieved to facilitate systems testing.
TransEd largely stopped any sort of mainline commissioning work with the LRV's back in October or early November for whatever reason.