Stevey_G
Active Member
Do you mean the same Tawatina Bridge that was built without any benches?
Can’t give homeless people a place to congregate and sleep good sir! Them’s are the planning and design fears.
Do you mean the same Tawatina Bridge that was built without any benches?
That's great, just to bad the train isn't serving the public yet, at originally intended.In the watching grass grow news, I saw a train leave Strathearn for Connors Road.
and the other IS GETTING STORED IN THE TUNNEL. His words, not me inferring. I wanna get photo confirmation of that, but, like. yeah, that's happening apparently.
I’ve seen the signals work at Churchill Station, I’m just wondering if some of the brains of the pedestrians are. Some of them were crossing against the red lights.Flaggers still Downtown today. Are these signals working yet?
The depot for storage/maintenance is south of the closed section of track - so not sure how you could operate the line without access to that.Even though it wouldn't be completely effective what about starting to run some trains between Bonnie Doon and Downtown for the public?
A moot point given the structural concrete issues. I imagine they adjusted other project schedules based on extending the timelines to fix the pillars.Traction power is shut off in the vicinity of the Grey Nuns stop, for work in and around the stop.
Imagine if TransEd was actually trying to get this line running for September 4th. By now they would have to be running simulated service along the whole line. There's no way they would have made September 4th if they still needed to do power shutdowns.