Lots of rebar in that transfer slab.
Pic by me today June 27th:

rixUZ9s.jpg
 
Pic by me August 10th:

I can see the feature columns now.
2 have been poured, 1 looks ready to be poured and 1 is being formed.
You can also see the forms for the transfer slab above those columns.

yKje4G5.jpg


**********

Pic by me today.

Rebar being installed for the partial transfer slab above the feature columns.

oMz9jmW.jpg
 

Back
Top