Action shots by me Saturday, Nov 16th.
I've seen them stop traffic on Smithe while hoisting the forms,
but not this time.

7oaZmq2.jpg


QHnP4i1.jpg


jCneLLr.jpg
 
First window wall is up today.

They have built a short concrete (?) sill on which the window wall sits.
Not sure why that is, but presumably for weather protection from pooling water since the window wall is setback from the slab edge.
The window wall is also set between two steel stud framed walls, so there is the delay in framing each opening.

Pic by me today.

QJMoyak.jpg


From yesterday's pic - showing the sill.

To1RtH5.jpg


I just realized that they cut back the framed walls that they had built.
Pic below from Nov 5th where the walls go almost to the slab edge.
The current state is about a foot back from the slab edge
(you can see the recesses in the underside of the slab for venting)

officedweller;8738910 said:
Pics by me [Nov 5th]:

gpmveNb.jpg
 
Pics by me today:

7aPxSc3.jpg


aasTvcW.jpg


Fire sprinkler pipes are in on the office floors.
Looks like they'll have bare ceilings (sprinkler heads point up).
Note the orange marks on the ceiling marking the columns above.

2OdDpYK.jpg


QOXoeao.jpg
 
Pics by me yesterday.

Yes, they were moving forms in those wind gusts.
They've moved some tarps, so you can see the transfer slab for the penthouse floors.

E0lFBtw.jpg


m92DAd2.jpg


This rendering shows a setback for the top 3 floors.
Another render from below seems to only show 2 penthouse floors, but this one shows 3 (and 3 penthouse floors makes 26).

2.jpg

 
Last edited:

Back
Top