First window wall is up today.
They have built a short concrete (?) sill on which the window wall sits.
Not sure why that is, but presumably for weather protection from pooling water since the window wall is setback from the slab edge.
The window wall is also set between two steel stud framed walls, so there is the delay in framing each opening.
Pic by me today.
From yesterday's pic - showing the sill.
I just realized that they cut back the framed walls that they had built.
Pic below from Nov 5th where the walls go almost to the slab edge.
The current state is about a foot back from the slab edge
(you can see the recesses in the underside of the slab for venting)
officedweller;8738910 said: