doesn't look like the one in the render.

Yeah - 2 different versions of the top don't have a setback.
It could be filled out with steel framing.

Changing City;9341632 said:
This might show the top of the building once it's completed. It's from GWL Advisers, the developers, and I think it's the DP version. There were some changes after the Rezoning - I'm not sure if it was just the glazing, or some of the floorplate details as well.

Vancouver-Centre-II-Renderings-2017-4-960x612.jpg

jollyburger;9342215 said:
Structural engineers had this rendering up. I assume it's old.

VAN_106732_N3.jpg


https://www.rjc.ca/project-details/vancouver-centre-ii.html
 
Pic by me today - new steel up top.
That's gotta be the final height.
So the question is whether that steel will be full width of the tower or whether the tower now has a stepped top.

88uvhNo.jpg
 
Demolition for connecting the 2 lobbies has started.

Pic by me today.
Evv7bRK.jpg


and installation of the first course of curtain wall above the setback has also startd.
Looks like a wide spandrel band similar to The Post.

y8If4qY.jpg
 

Back
Top