You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser.
By me today.
Cladding on the west side being installed.
Pics by me today.
Spandrel covering the core and big struts to support the patio canopy.
By me today,.
Steel superstructure being installed up top.
Could fill in all the steps at the top.
By me today.
The south side setback will be enclosed.
By me today.
Not sure if there's a recess for a light strip at the base of the left side fin (see rendering on hoarding),
so wondering how that will be installed.
Four generations of architecture:
Pic by me Friday, Nov 19th:
New flashing being installed at the top of Scotia Tower
(unless that's a light strip?)
Last edited: