archited
Senior Member
Likely a sound barrier.
|
|
|
Just a fence, The sound wall is on the other side (Left inthe picture).View attachment 565737
Are they installing black metal posts for some sort of "fencing" being installed on top of the retaining walls in this pic?
Traffic issues tend to be north south on those 2 roads. Since 149st was closed it moved a lot of traffic onto those other 2 roads.Has anyone noticed any traffic issues with people using St Albert Trail and 156 St interchanges to turn around? I find navigation apps tend to route people on 123/124/128 Ave so maybe it hasn't been a huge issue. Although I still think St. Albert Trail interchange is a very good candidate for Edmonton's first diverging diamond interchange.
As in 149th st closed between YHT and the rail tracks? AFAIK it's always been the plan to have that remain open just no 149th N/B crossing over the YHT.I've noticed that the 149th street crossing is semi open, for southbound onto westbound yellowhead, and from westbound yellowhead onto northbound 149th street. The road behind the ex-ramanda location is now 1 way eastbound onto 149th north and southbound.
iirc, I remember seeing the proposals and was under the impression 149th was going to be closed completely, anybody else?
I hate that the service road to Northgate is closed (great place for rail shots), and it's sad to see a couple of piles is all that remains of NorthgateI pulled over to snap some pics from 121 St and the 115 St interchange construction