News   GLOBAL  |  Apr 02, 2020
 8.6K     0 
News   GLOBAL  |  Apr 01, 2020
 39K     0 
News   GLOBAL  |  Apr 01, 2020
 4.8K     0 

Good to see that they are "moving" the road over south of 23rd ave to accommodate construction for next season. We have seen that they always use/waste the "1st year" of construction as a time to move the roads.
 
It's unfortunate that there isn't enough money for adding sufficient capacity via new LRVs and a bigger OMF. This will have downstream effects on the Metro Line expansion, because Phase 2 of that project won't include another OMF. Shorter trains or frequency cuts would be the result in the interim.
 
Capture.PNG
 
It's unfortunate that there isn't enough money for adding sufficient capacity via new LRVs and a bigger OMF. This will have downstream effects on the Metro Line expansion, because Phase 2 of that project won't include another OMF. Shorter trains or frequency cuts would be the result in the interim.
That's so far down the track it's not worthwhile worrying about. I'm sure the NLRT funding would now include money to expand the OMF to it's intended size. Ditto for sufficient LRV's.
 
City of EdmontonCity of Edmonton94,975 followers94,975 followers
19h • 19h •


The City of Edmonton is hosting a networking event for local businesses who are interested in working with, or providing products and services to, the successful Design-Build proponent team for the Capital Line South LRT Extension (Phase 1).

Event Details (limited registration):

June 15, 2023, from 8:30 A.M. to 4:00 P.M.

Sawridge Inn and Conference Centre Edmonton South (Maligne Room)

Register here: https://lnkd.in/gqDFyaxR
 

Back
Top