God I hope in a couple of years this goesApparently Groat road is open again ahead of schedule
“Apparently Valley Line West is open ahead of schedule” instead
God I hope in a couple of years this goesApparently Groat road is open again ahead of schedule
God I hope in a couple of years this goes
“Apparently Valley Line West is open ahead of schedule” instead
Internal, or where from?Don’t bet on it. Already hearing 1 year delay.
A year from when. They originally said either 26 or 27.Don’t bet on it. Already hearing 1 year delay.
Yes so end of 27, instead of end of 26A year from when. They originally said either 26 or 27.
Biggest infrastructure with the longest time lines so make sense to get them going first.Nice to see the bridges and elevated sections getting taken care of early.
Can you elaborate as to why?Yes so end of 27, instead of end of 26
Marigold Infrastructure Partners (MIP) continue construction along the alignment. Work is well underway at Lewis Farms (with storage building construction), Gerry Wright OMF (with building expansion), 87 Avenue (with piling and pier construction), 156 Street (road and sewer works), and Stony Plain Road (road and sewer works). MIP have commenced temporary road widening along 87 Avenue to accommodate traffic during construction. MIP closed Stony Plain Road between 139 Street and the bridge over Groad Road in late April 2023. Stony Plain Road from 139 Street to 131 Street is anticipated to reopen to traffic on October 31, 2023. Hyundai Rotem Company is supplying 46 low-floor light rail vehicles (LRVs). Concept design of the LRVs was completed in May 2022, and HRC delivered a mock-up of the LRV to the City in March 2023. In May 2023, the City completed user-testing with various public groups to evaluate the train's accessibility and design components ahead of final production.
Where do you see the update date? If it's at the very bottom, that date is on every project page - including ones that are very out of date (like how the Fort Road page says a milestone is expected in spring 2023: https://building.edmonton.ca/projects/eB-10529?categoryId=all:&tab=list). I'm sure the VLW page is still up to date (at least relatively), but it might not be as of June. Just putting it out there since I've seen the date at the bottom referenced before, and I'd love to know if there's something I'm missing.So far, the city's project tracking sitewith the latest update posted in June 2023.