trainfanjacob8
New Member
I wonder how much of it is the equipment, and how much of it is the track. Personally, I find the new Venture sets to be much smoother and quieter then LRC and HEP equipment. In regards to the track, it is frustrating to see how many slow orders have popped up on CN track in SWO over the last few years. Kitchener-London, Komoka-Glencoe, and Strathroy-Watford all have long sections of reduced speeds.On the TRTO->WDON right now. I’m shocked at how rough the ride is. It’s like being on a plan with constant turbulence. Makes it obvious how far we have to go in order to be ready form HSR.