ntt1
Active Member
It's a bit too bad that they couldn't have been finished before the back-to-school rush, but I guess they should be done before the winter.
I also wonder how/if the 23 Ave one will connect with the Saddleback Road bike lanes in some way. However, those really need to be redesigned into something less half-baked in the next few years when Blue Quill/Steinhauer/Ermineskin/Duggan gets neighborhood renewal. Or maybe 106 St undergoes collector renewal through those areas. It's kind of pathetic coming out of the new infrastrusture through Pleasantview to get dumped out on those painted bike lanes on crumbling, wide roads.
I also wonder how/if the 23 Ave one will connect with the Saddleback Road bike lanes in some way. However, those really need to be redesigned into something less half-baked in the next few years when Blue Quill/Steinhauer/Ermineskin/Duggan gets neighborhood renewal. Or maybe 106 St undergoes collector renewal through those areas. It's kind of pathetic coming out of the new infrastrusture through Pleasantview to get dumped out on those painted bike lanes on crumbling, wide roads.





