The first batch for this date is now on line and shows how far behind I am
This is all the steel area for the entrance to the station then and now.
No idea what is planned for the creek beyond the trees that goes behind 4 houses
Sound Barrier in front of the 4 houses before the tracks move to the centre
Until the poles are remove and sidewalk built to the east of hydro poles, cannot build the curb lane for northbound traffic as well building the guideway
The road have been paved from Mineola to 200' south of the QEW off ramp and ready to be open for 1/2 to 3/4 of the curb lane and a good chunk of the sidewalk now.
Expect there will be 2 lanes in both direction for the winter in most areas with traffic being shifted in the spring to do the northbound lane.
Cannot build the guideway for Pinetree Intersection and can't recall if one will before Pinewood until the northbound lane has been built
The first batch for this date is now on line and shows how far behind I am
This is all the steel area for the entrance to the station then and now.
No idea what is planned for the creek beyond the trees that goes behind 4 houses
Sound Barrier in front of the 4 houses before the tracks move to the centre
Until the poles are remove and sidewalk built to the east of hydro poles, cannot build the curb lane for northbound traffic as well building the guideway
The road have been paved from Mineola to 200' south of the QEW off ramp and ready to be open for 1/2 to 3/4 of the curb lane and a good chunk of the sidewalk now.
Expect there will be 2 lanes in both direction for the winter in most areas with traffic being shifted in the spring to do the northbound lane.
Cannot build the guideway for Pinetree Intersection and can't recall if one will before Pinewood until the northbound lane has been built