  1. J_gordo

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    Marigold wouldn’t be responsible for that, they would likely get city data or input and calculate the timing that way. Or it is worked into the software program they are running for the signals. Either way, the city has never fixed my complaints about timing on 111th street and it’s been 5 years...
  2. J_gordo

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    I’m still skeptical that metro NW will get funding. Based on the AB master rail plan, the province will want to fund the capital line south to the airport so it could connect with a future HSR / commuter rail (assuming it happens). Bad timing of course, but StA won’t fund an LRT that would bring...
  3. J_gordo

    Capital Line LRT

    Are they conducting renewals on the black mud creek bridges as well as adding an additional lane? The southbound one is completely closed. Can’t imagine traffic here at rush hour. Also curious how they’ll build the AHD bridge. Renderings would say they need to erect steel and then place the...
  4. J_gordo

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    Metro to St. Albert isn’t happening for another decade +
  5. J_gordo

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    The progress they are making so far in January is quite impressive, usually the slowest construction month has seen lots of work progress. I’m optimistic
  6. J_gordo

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    If anything I think it shows how much better things go the second time around. Like mentioned before, lots of people at MIP worked at transed, so they took the lessons learned and have clearly made improvements.
  7. J_gordo

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    I think all of the major steel overhead structure is up at the mix now. Making good pace
  8. J_gordo

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    Time to take the wrecking ball to the old building behind it. Good god that is ugly
  9. J_gordo

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    Still not sure if I believe they’ll have all the track laid by the end of the year
  10. J_gordo

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    Idk they’ve had those lanes closed for 2 full construction seasons. Seems excessive, plus they could have just waited till spring, or poured the concrete in the fall? It’s not like they’ve made huge progress since end of November, all they’ve done is work on the switch and put up some Davit arms
  11. J_gordo

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    Reopen the lanes, just to close them again. Doing trackbed in that area doesn’t even require lane closures either
  12. J_gordo

    Misc. Transportation Projects

    Yes, but now I work for the utilities regulator
  13. J_gordo

    Misc. Transportation Projects

    We had the 2024 incident at the E.L smith WTP, but outside of that, nothing major. EPCOR is crazy regarding upkeep and monitoring of their infrastructure. I remember working at both their WTP’s and the equipment and infrastructure is world class. As the article I posted mentioned they are very...
  14. J_gordo

    Misc. Transportation Projects

    How Edmonton is building a water system that lasts A good article published by EPCOR’s CEO. Seems like they had a similar idea to me…. Funny
  15. J_gordo

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    Seems very ambitious to have all track laid by the end of this year especially if they no longer pour track slab in the winter. I guess they could form and place rebar over the next couple of months to prepare for the warmer months but seems like a stretch. Maybe that cool form work traveller...