News   GLOBAL  |  Apr 02, 2020
 8.9K     0 
News   GLOBAL  |  Apr 01, 2020
 40K     0 
News   GLOBAL  |  Apr 01, 2020
 5.1K     0 

  1. J.OT13

    Ottawa | Gladstone Village | OCH | DSAI + Hobin

    Hoping we add the first Gladstone CLV tower and the first Brigil Greyhound by year's end.
  2. J.OT13

    Ottawa | Gladstone Village | OCH | DSAI + Hobin

    Hope the LeBreton project is proposed soon. I'd love to see the Library District complete by the end of the decade.
  3. J.OT13

    New Gatineau Regional Hospital | 600 Beds

    That's good to hear Harley. We rarely get these kinds of positive reviews about the health care system in the Outaouais. In the media, the horror stories we hear are mostly related to the ER department and acute care. People dying from very basic stuff because of lack of equipment. The Cancer...
  4. J.OT13

    Ottawa | Gladstone Village | OCH | DSAI + Hobin

    They were building the roads and City infrastructure over the last few months. Renderings of P1 is at the top of the page. It will have 338 units.
  5. J.OT13

    Ottawa | Gladstone Village | OCH | DSAI + Hobin

    According to people on Rail Fans Canada Discord, excavation has started on P1.
  6. J.OT13

    Renaissance Marriot | 118m | 36s | Rimap | IBI+GeigerHuot

    According to people on Rail Fans Discord, the site is active.
  7. J.OT13

    Place des Pionniers [Aylmer] | ?m | 3s | Ville de Gatineau | In Situ+DMA

    I don't think there's an official way of doing it, unlike the referendum to kill any project that's slightly outside zoning. If enough people complained maybe, but I doubt most people took the time to research it, or even know of this recent change.
  8. J.OT13

    Bloome Appartements [Hull] | ?m | 2x10s | Groupe Kevlar | Forme Studio

    Seems to be a Quebec thing. We see a lot of that in the Montreal area as well, Griffintown being a good example.
  9. J.OT13

    New Gatineau Regional Hospital | 600 Beds

    Yup. Both cities have been neglected by their respective Province. Gatineau doesn't get the proper funding because Quebec figures Ottawa can take care of them, and Ontario only gives Ottawa enough money to barely take care of their own, let alone the 300k+ from Gatineau and surrounding area who...
  10. J.OT13

    Ottawa | 1705 Carling Ave | 33+73m | 9+22s | Claridge | RLA

    Most people could never tell the difference between this and "Story of 🤮" on Rideau. RLA has produced some truly terrible designs.
  11. J.OT13

    Azure Westboro | 83.4m | 26s | Azure | BDP Quadrangle

    I like what they did with the expansion joints, the rows of bricks extruding from the facade instead of just a line. Whole thing looks really good. Great quality. Not charcoal.
  12. J.OT13

    341-347 Boulevard Saint-Joseph [Hull] | ?m | 6s | Aldo Construction | Geiger Huot Architectes

    Une nouvelle coopérative d’une centaine de logements sur le boulevard Saint-Joseph Par Mathieu Bélanger, Le Droit 12 juillet 2024 à 05h00| Mis à jour le12 juillet 2024 à 10h57 Le projet immobilier de la Coopérative d'habitation de la Cité-des-Outaouais (Courtoisie Fédération intercoopérative...
  13. J.OT13

    Ottawa | 1490-1500 Merivale Rd | up to 34m | up to 11s | Claridge | EVOQ

    New renderings. Back to white cladding.
  14. J.OT13

    341-347 Boulevard Saint-Joseph [Hull] | ?m | 6s | Aldo Construction | Geiger Huot Architectes

    Discussion History: https://skyscraperpage.com/forum/showthread.php?t=251513 Location...
  15. J.OT13

    Renaissance Marriot | 118m | 36s | Rimap | IBI+GeigerHuot

    Thanks for sharing @Bluejay! If they stick with some high grade cladding and glass, this will complement Relevé very well. Similar enough to know it's the "same" complex (despite being two different developers), but different enough to make it interesting. I like that all three towers have...
  16. J.OT13

    315 Miwate at Zibi [Block 204] | 74.57m | 23s | Dream | NEUF

    Really wish Gatineau had a proper DevApps website like Ottawa's.
  17. J.OT13

    Baseline | ?m | 16s | Brigil | NEUF

    Elevate your ‘Baseline’ and enjoy an active lifestyle Author of the article: Ursula Leonowicz • Postmedia Content Works Published Jun 08, 2024 • Last updated Jun 08, 2024 • 2 minute read Brigil's Baseline Tower 2 will welcome its first residents in the fall of 2024. SUPPLIED IMAGES Part...
  18. J.OT13

    315 Miwate at Zibi [Block 204] | 74.57m | 23s | Dream | NEUF

    My uneducated guess is that Dream is focusing on the dig at LeBreton. Once the crane goes up over there, then they might start digging Block 204.
  19. J.OT13

    Common at Zibi | 78.5m | 25s | Dream | Kohn+Teeple

    @hoggytime you had this at 70 meters however, this suggest it's actually 78.5 meters, which is more in line with a 25 floor tower. Edited thread title.
  20. J.OT13

    267 O'Connor St | 97.65+88m | 25+28s | Taggart | UNStudio + Hobin

    Makes sense. It seems taller, slimmer towers could respond to some of UDRP's concerns.

Back
Top