News   GLOBAL  |  Apr 02, 2020
 9.6K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.4K     0 

  1. turini2

    Sheppard Line 4 Subway Extension (Proposed)

    Yep, interlining is overrated - if lines are frequent and transfers are easy, of course.
  2. turini2

    Sheppard Line 4 Subway Extension (Proposed)

    Given the timeframe of the Downsview developments, I could easily see it becoming a cheap and easy construction staging area for the western section. Furthermore, extending Wilson Yard is definitely the cheapest yard option for the extension - I think I'd prefer a cut and cover construction...
  3. turini2

    TTC: Other Items (catch all)

    Really interesting - my experience in the UK is that manufacturers of buses/trains now see long-term maintenance contracts as another source of income. Without naming a particular rolling stock manufacturer, having a much lower purchase price but linking the price to a maintenance contract that...
  4. turini2

    Roads: Ontario/GTA Highways Discussion

    To add my two cents - is Toronto a "world class" city or not? Because if it is, it can handle some closed roads for events like every other "world class" city around the world that manages to host things like marathons, cycling races, festivals and protests! Even car-centric LA can have a...
  5. turini2

    Eglinton East LRT | Metrolinx

    Because bus lanes can be installed in a few weeks and building LRT takes years. Perfection is the enemy of good.
  6. turini2

    Montréal Transit Developments

    Well, the bit of EXO replaced by the REM isn't open yet... The Mont Royal tunnel has been shut since May 2020. In the long term, it may cause issues for high speed rail to access Quebec City from Montreal - Alstom's 2022 HFR presentation shows a time wasting reversal in and out of Montreal...
  7. turini2

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    If anything that might take even longer - systems are so integrated that it would be very difficult to do this. Also, the "remaining complications" are relatively minor, we can wait. It's not Seattle, where a large section of their under construction Line 2 is being rebuilt before it even opens...
  8. turini2

    TTC: Other Items (catch all)

    Another emergency TTC meeting appears...
  9. turini2

    Roads: GTA West Corridor—Highway 413

    Yeah that's quite a substantial bridge - and one that could get even longer if it means bridge piers are better placed...
  10. turini2

    King Street (Streetcar Transit Priority)

    And in due course, a street redesign could help King look distinctive so that drivers don't automatically drive down it by second nature, ignoring all signs etc. NACTO has some good examples Downtown Shared Transitway, as does Melbourne on Swanston Street.
  11. turini2

    King Street (Streetcar Transit Priority)

    Oh yes, it's not compliant ... but regulations can always be changed! :) It's an example of worldwide best practice - rather than the "oh how terrible, we will never be able to fix this problem that no one else has ever had" mindset common in North American transit circles.
  12. turini2

    King Street (Streetcar Transit Priority)

    The very excellent Marco Chitti replies to the viral silly sign set up ...
  13. turini2

    King Street (Streetcar Transit Priority)

    Mm... not sure if it's the same in Toronto, but there's been a noticeable worsening of behaviour since the pandemic. Drivers not using or obscuring number (licence) plates, especially...
  14. turini2

    Toronto Toronto | Concord Park Place: Block 9 | 151.85m | 44s | Concord Adex | DIALOG

    There's no way that reality will look like that render... On the positive side, glad to see more schools in tower podiums, I suppose. (Maybe a question for the master thread of Concord Park Place, if there is one) I assume Block 7 will be the final phase, given it's the sales centre for the...
  15. turini2

    Toronto Toronto | TYSSE: Pioneer Village Station | 11.89m | 1s | TTC | aLL Design

    Sorry to bump this thread - have there been any proposals for TOD on these lands? No issue with the subway underneath as far as I can tell.
  16. turini2

    Toronto Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    Looks amazing! The exhibition was in central London - not at their offices unfortunately. Many architectural practices open up for Open House London (our equivalent to Doors Open, basically) so hopefully I'll get to visit one day. They had a few sketches, and a modern 3D printed mini...
  17. turini2

    Toronto Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    WilkinsonEyre are celebrating their 40th anniversary this year, so they had a little exhibition in London showing off their history and current projects. Snapped these shots of the CIBC Square model they've got, thought y'all might be interested - you can see the Oval cricket ground model in...
  18. turini2

    Sheppard Line 4 Subway Extension (Proposed)

    I think the Ontario budget documents could do with a spell check 😅
  19. turini2

    Toronto Toronto | Ontario Line: Moss Park Station | ?m | ?s | Metrolinx | HDR

    Ah, I found the example I was thinking of

Back
Top