News   GLOBAL  |  Apr 02, 2020
 9.6K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.4K     0 

  1. J

    Toronto Toronto | Rogers Centre Renovations | ?m | ?s | Toronto Blue Jays | Populous

    More pics here would suggest the hotel is fairly freestanding as opposed to an integral part of the structure that holds up the roof. https://www.blogto.com/city/2016/09/how_toronto_built_the_most_hyped_sports_stadium_ever/
  2. J

    Toronto Toronto | Rogers Centre Renovations | ?m | ?s | Toronto Blue Jays | Populous

    IIRC the hotel was a tack-on and not part of the original design that sits outside of the "ring" of the roof. No idea whether that means it can be surgically removed to open up the north end somehow or not, but having more of an open air feel out in the outfield would help, especially if that...
  3. J

    Vancouver | MEC Flagship | ?m | 3s | Beedie Development | Proscenium

    The contrast between this building and the MEC store about to open in downtown Toronto is pretty amazing. Same goes for the reactions to the building on the thread. Over in Toronto the new MEC store on Queen is regarded as the worst abomination to ever be built in our fair city. Maybe it is...
  4. J

    TTC: Flexity Streetcars Testing & Delivery (Bombardier)

    4528 seems to be out this morning either in service (finally), or perhaps doing an in service test. It's signed as a 504 this morning and at Dufferin Loop when I last checked.
  5. J

    Toronto Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    It's "the cheapening" at a new and unprecedented level! Even for Toronto.
  6. J

    Toronto Toronto | Riverside Square | 64.6m | 20s | Streetcar | RAW Design

    Curious exactly how much money or time they saved by re-using the frame of the old storage place in the new building. It seems like it would be a liability to have that old structure in there. Interesting to note that the BMW office across the road did the same thing many years ago.
  7. J

    Vancouver | Keefer Gardens @ 239 Keefer Street | ?m | 8s | Rendition | MGBA

    The cutout to provide balcony space/light to the interior is nice. Avoids having any units overlooking that ugliness out back.
  8. J

    Vancouver | 1698 West Georgia Street | 99m | 33s | Anthem | Kohn Pedersen Fox

    There is some impressive change coming to this little area when you add in 1684 and 1550 Alberni, plus 1616 and 1500 W. Georgia.
  9. J

    TTC: Flexity Streetcars Testing & Delivery (Bombardier)

    4573 finally showed up on the Nextbus feeds tonight. Currently sitting at Leslie Barns.
  10. J

    King Street (Streetcar Transit Priority)

    Nothing short of enforcement cameras, a cop literally standing there with a ticket pad in hand or a strong physical barrier would stop people who see all the signs and just don't care. Even with those measures, you'll still get some entitled drivers who would just go around them, claim ignorance...
  11. J

    TTC: Flexity Streetcars Testing & Delivery (Bombardier)

    Sneaky. 4573 has yet to show up on Nextbus for whatever reason.
  12. J

    Vancouver | Burrard Place | 167.63m | 54s | Reliance Properties | IBI Group

    Reddit has some talk of a construction accident at Hornby and Drake. Looks like maybe a concrete pump boom came down and the sidewalk protection did its job. No injuries. Seems to be in the same area as this pic from City of Rain -
  13. J

    Toronto Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    Those temp offices hanging off the side are a "nope-nope-nope" for me. They have to be a little bit un-nerving to work in.
  14. J

    TTC: Flexity Streetcars Testing & Delivery (Bombardier)

    @drum118 Do you know if the poles and associated equipment are able to be "easily" removed down the line when they are no longer needed?
  15. J

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Neat tour and pics, thanks! I was looking at some stuff from the Confederation Line in Ottawa and they dug a single tunnel with both directions rather than one tunnel for each. You can see it here in this video timelapse of the line: Makes for a different feel than the single tunnels and feels...
  16. J

    TTC: Flexity Streetcars Testing & Delivery (Bombardier)

    4524 is out in service as a 501 right now. http://ttctracker.ca/detail.php?v=4524
  17. J

    Toronto Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    Seems heat is a bigger issue than cold although both are manageable according to the info linked below. In cold, the curing process itself generates heat sufficient to keep things within the required range assuming it's a big pour and you do some insulation around the forms and exposed areas...
  18. J

    Toronto Toronto | Garrison Point | 118.56m | 35s | Cityzen | Hariri Pontarini

    Nice to see the white panels going in now that will start to define the facets better. I'm hopeful looking at the various cutouts and angles on the concrete balconies and other little concrete details that we'll get what the renders show.
  19. J

    TTC: Flexity Streetcars Testing & Delivery (Bombardier)

    4523 is tracking now (at the Leslie Barns). http://ttctracker.ca/detail.php?v=4523 4522, which was offloaded a few days before 4523, hasn't shown up yet.
  20. J

    Toronto Toronto | 34-50 King East | 112.36m | 33s | Larco | a—A

    Quick PS job to extend the cornice to the edge of the new build.

Back
Top