Alex_YYC
Senior Member
I missed this thread altogether, so I'm a late voter. I chose option 1.
|
|
|
What would break the bank isn't the tunnel, it would be a station that can support game day crowds. Underground stations for even small numbers of people are an order of magnitude more expensive than at grade.cut and cover on the east side of the tracks fm cemetary hill to 11th ave doesnt strike me as something that would break the bank, if there was a bank.
not doing it now makes doing later seem all the more difficult/impossible.
You're going to make me drool on my keyboardThis link may get started soonish. Looks like Crosstown by Anthem may be a go according to the Conference Board of Canada Cgy Metropolitan Autumn 2018 report.
View attachment 167903
I think that's a great idea. Raise the street wall a level on both sides of MacLeod. Have the train and MacLeod at grade. "Flood proofing". You could add MacLeod car access at 24th ave and keep 25th ave as a boulevard connection Mission, Elrton, Stampede, Ramsay, Manchester, and Blackfoot. It could be great for the "Barley Belt" and the future of those neighbourhoods.i use 25th quite a bit, none of the options address the east-west flow which is considerable.
aside from that, if there were to be development on both sides it would be cool to have a boulevard width ped/cycle bridge over macleod, linking to a mezzanine level on either side.
What would break the bank isn't the tunnel, it would be a station that can support game day crowds. Underground stations for even small numbers of people are an order of magnitude more expensive than at grade.
A station that might work with a tunnel would be it popping up for just the station to ground level. Northbound has level access, and southbound has large ramps (blue) over the tracks then to the platform.
View attachment 167869
No, but one of the many reasons the Greenline is truncated is the switch to underground stations - they cost a lot. Just a tunnel isn't so bad - all the associated infrastructure increases costs. Hence on the West LRT where a trench was way more affordable than a tunnel, when the tunnel wouldn't have had a much higher cost at first glance, just putting on a roof. But after a certain distance of tunnel, you need emergency exists, refuges, ventilation etc. Hence the Barcelona method of shaft and in-tunnel stations as an innovation to keep costs lower being explored.Would it be any costlier than the Westbrook Station or any of the Greenline stations?