You can view the page at http://urbantoronto.ca/content.php?1831-Spadina-Subway-Extension-Vaughan-Centre-Station
It will take 30 - 35 years for the density of VMC to match that of North York City Centre. Heck, it took that same amount of time for NCC to develop after the construction of the North York Civic Centre. Meanwhile, inner Toronto ends up subsidizing the operating cost of maintaining this line, when a "beefed" up version of GO Transit should have been the answer for this area.
Another crucial mistake on Vaughan’s part was locating their new city hall up on Major Mac & Keele when it should have been down here. Suburbs like Vaughan need all the stimulus you can get to develop a true & meaningful “downtown†core.