Difference is bedrock versus water saturated gravel, silt and sand supported by clay. Yay unconsolidated glacial sediment! Even the more bedrocky parts are sandstone, siltstone and mudstone. Sandstone and silstone can be tough, while mudstone degrades into soil easily. With the layers being so thin for the most part, you can have very different soil types along a tbm cutter head, and as the tbm advances.Meanwhile Stockholm, a city of water and islands, has a maze of 100 subway sations, half of those undergroud, with routes tunneling under waterways and through miles of bedrock
Due to the geological history of the Calgary region, the bedrock in Calgary is highly variable in nature, from relatively weak mudstones to competent sandstones. The rock units found within the region are significantly interfingered and laterally and vertically discontinuous. For each project within the region which passes through bedrock, it is important to complete a detailed site investigation, including geotechnical strength testing in order to gauge the degree of lithification at the specific site location.
For the mudstone units, a lower correlation value of less than 10 for PLT results is suggested. Slake testing using a Slake Index test is recommended for samples of the mudstone unit encountered in the site investigations. The Index test allows for better quantification of the tendency of the unit to degrade with exposure to air or water.
Due to the discontinuous nature of the bedrock, it is important to always factor in a fair amount of variability into the expected conditions during the excavation design process. As well, it is important for contractors to incorporate the information provided by the geotechnical reports in the selection of the type of TBM and cutting tools.
Challenges at recent tunnelling projects within the city have been strongly linked to inappropriate TBM cutterhead selection, unexpected ground conditions and the weak mudstone unit. From review of the past experiences, it is highly recommended that combination cutting tools are used when tunnelling through the Calgary bedrock, which is a highly heterogeneous yet tectonically undisturbed sedimentary rock. The use of combination cutting tools, will enable TBM micro-tunnelling through the majority of the Paskapoo units, whether expected or not, along a tunnel alignment.
Due to the adhesive properties of the mudstone unit during excavation, it is recommended that the use of polymers or additives at the excavation face be further investigated, in order to reduce adhesion of clay particles. The reduction of adhesion of the mudstone to the equipment will improve advance rates by reducing maintenance and operational delays.
As several projects were found to deviate from their designed alignment, and in many cases required significant realignment, continual alignment monitoring is suggested for use in the micro-tunnelling TBMs. Gripper size should also be reviewed, in order to ensure that grippers are wider than individual layers expected within the tunnel wall, to avoid grippers pressing into discrete weak layers within the wall when advancing
If it wasn't for the line running down 7th ave, they probably would have gone with the at grade path. They'll have to either tunnel under or go elevated....or bury the 7th ave line.I mean there's no real reason to spend all the money trying to tunnel underneath the Bow, most I'd see happening is the bridge going into the side of the hill on the north end Edmonton style
I’m not sure they will.Build it and they will come.Build it and they will ditch the car.
we're throwing stones from a glass house if we're chirping about LRT delays
Things are off the rails again with Edmonton’s Valley Line... There's currently no timeline for an opening for a line that was set to open in 2020. I lived there when they tried to open the line to NAIT, the train could only go 30km/h and would cause traffic to stop for up to 11 minutes at one crossing during rush hour because of train frequencies. I also remember a bridge over Groat Road being delayed because the steel warped. Something in the water up there...
Is Calgary much better, probably not but I don't think the city's list of delayed major projects is as long? I think they got ahead of themselves with Green Line. Were they really ever going to be able to build the whole line for what they said? I think it was people saying things when they had no idea what they were talking about. Its going to be a long time before we actually ride the Green Line but wouldn't we be waiting now anyways for the utility relocation? They've also cleaned up two old landfills while we've been waiting, so you could say construction has already started... ha (tongue firmly planted in cheek).we're throwing stones from a glass house if we're chirping about LRT delays
both cities need to get their act together and build way more light rail transit, way faster
I had no idea they did this, imitation seems to work well in infrastructure projects.the west LRT built very standard columns, replicated from the Canada Line in Vancouver.
If the project was built with no consideration for impacts on traffic I think so.Were they really ever going to be able to build the whole line for what they said?
Could you imagine that in this city... "Sorry drivers, traffic might be bad now, so just take the train we built."If the project was built with no consideration for impacts on traffic I think so.
I only say this half jokingly; can we go after car and oil companies the way we went after big tobacco? Isn't it well documented they coordinated efforts to make us need to drive?It's not that the portion of the Green Line project that serves transit users is expensive and risky; it's the portion that serves drivers.