Yikes. I mean, I am glad it’s being put on hold, as this latest proposal for the line is essentially useless, but of course I am anxious for the thing to actually begin construction.
I am hoping that if this current iteration gets outright cancelled, they can come back with all of their already-complete detailed design work and actually propose something within the original scope (16th to Shepard) and get the money that’s *actually* needed for it. Adding McKenzie Towne as the southern terminus would make it a better business case as well, rather than it running through half its length and terminating in a population void. Request the 10 billion it’s likely going to take (for some reason?) and get friggin moving. We’re ready to go.