Sounds like some of the downtown stakeholders are getting a bit worried the UCP will hand them a Green Line plan that resembles something they've already tried to stop back when they had a seat at the engagement table and pushed for tunnels. Also the costing math Smith references reminds me of the type of math that was used back in 2015 when they said the entire line could be built for $4.6 billion. Are we going to end up with another poorly costed plan and a failed procurement?
Downtown stakeholders 'want to be in the room' for Green Line realignment talks
A study into an alternate Green Line alignment for downtown Calgary has led some organizations to hope they will be heard at planning talks.