General rating of the project

  • Great

    Votes: 8 27.6%
  • Good

    Votes: 16 55.2%
  • So So

    Votes: 3 10.3%
  • Not Very Good

    Votes: 2 6.9%
  • Terrible

    Votes: 0 0.0%

  • Total voters
    29
20170924_172200_resized.jpg
 

Attachments

  • 20170924_172200_resized.jpg
    20170924_172200_resized.jpg
    259.6 KB · Views: 301
If I’m counting right, INK has only 3 more floors to go. It’ll be topped out before Christmas.
 
It has 6 floors to go plus the rooftop amenities level, which includes a substantial indoor component that isn't included in the floor count. The podium is just one double-height level, not two floors. It's got a lil while to go yet.

Also just noticed that INK only has 22 units left for sale. 82% sales before completion isn't too bad in a market like this, especially considering how new the whole "micro-loft" thing is to Calgary.
 
Last edited:
It has 6 floors to go plus the rooftop amenities level, which includes a substantial indoor component that isn't included in the floor count. The podium is just one double-height level, not two floors. It's got a lil while to go yet.

Also just noticed that INK only has 22 units left for sale. 82% sales before completion isn't too bad in a market like this, especially considering how new the whole "micro-loft" thing is to Calgary.
lol, I got 5 more floors to go from my count. I'm counting the 9th floor as being poured already.
 

Back
Top