A beautiful day for a walk through the area to get some construction updates.
First off, the pathway connection to the south is being graded in. This will be what connects the eventual Radio Park with the broader pathway systemin West Springs. You can see Parkside in the background.
Parkside is still moving along. Still some exterior work to be done, not sure how quickly they are moving on the interiors. I have heard each unit is custom, up to the buyer, so there may not be as much urgency as it will be entirely dependent on individual unit sales.
Foundation work / parkade excavation is well underway at
Newberry is really coming along. I think i read occupancy of the first building is set for June, the second one doesn't seem that far behind:
There is some site prep work for Oak & Olive now under way, as well as the grocery store. The DPs aren't finalized I think, so this isn't construction of the buildings, but grading and perhaps some utility work. Still need to demo the old church and move the sales centre as well:
Mondrian's foundation work is also moving along:
And Trico's West83rd townhomes look to have some site prep work underway as well: