Quite a bit actually, considering the current design makes a Lawrence East Station impossible. Re-instating Lawrence East would likely require the entire tunnel design to be thrown out. There would either be 2 options, either keep the current tunnel design but then build a Lawrenece East station something like 20 stories below ground which obviously won't come cheap and drive up the timeline and scope of the project. The other option is a station closer to the surface but this would mean scrapping a large portion of the already finished engineering work.How much of a delay would be caused by reinstating the Lawrence East station? 3 months, 6 months, a year?