PICs 1 & 2 are complete. Click the buttons below to download session materials
www.metrolinxengage.com
EA is out for the DSBRT: Here are some highlights (Note that these are technically proof of concept, and don't represent what will actually be built)
Bus lanes temporarily end near UTSC before continuing again - requiring busses to quickly cross 2 lanes of traffic
.
Bus platforms shorten to 20m for whatever reason between UTSC and Sheppard/Kingston
Lanes briefly end at the Toronto/Pickering border, where there is a curbside platform, and eastbound busses have to immediately swap to the median:
Westbound busses from this point continue in curbside for a few hundred meters, before rapidly shifting to the median:
Eastbound only bus lanes in downtown Whitby:
Random 33m platform:
Downtown Oshawa segment splits into 2 segments, King Street and Bond Street, curbside lanes that match in quality with RapidTO:
Eastbound lane ends crashing face first into a 20m long platform. This is how this BRT ends.
I really hope that they make a lot of improvements before construction starts, with weirdly inconsistent platform lengths, to bus lanes that just randomly change the side of the road they're on, there's a lot of seemingly shoddy design that should definitely be fixed.