What do you think of this project?

  • I dislike it

    Votes: 0 0.0%
  • I dislike it a lot

    Votes: 0 0.0%

  • Total voters
    12
I believe it is to be relatively simple in nature and so I would hope the site works will be completed spring/summer and open fall of this year?
Good guess, the page IceCreamMan linked says September 2022.
 
Ready for landscaping work:
5D30CD30-F086-4747-A1D2-7BC53B7AE5C7.jpeg
 
Reference ID:Job No 452790044-002
Description:To develop a Comprehensive Sign Design Plan To install (4) Fascia On-Premises Sign(s) To install (6) Freestanding On-Premises Sign(s) (NORQUEST COLLEGE)
Location:10215 - 108 STREET NW
Plan 1520896 Blk 7 Lot 103A
Applicant:THE CYGNUS DESIGN GROUP INC.
Status:New
Create Date:11/1/2022 2:23:25 PM
Neighbourhood:DOWNTOWN
 
The park is already quite nice, but yes will be even better with bigger trees. IMO Norquest has done a much better job here than MacEwan, which years ago paved over some of the little green space it has.
 

Back
Top