Airboy
Senior Member
I'm wondering if there was an issue with the shoring on the east side. I see there is a graded area along that side.
You'd think they would change to a luffing type of crane?So I was talking to someone in the know yesterday, it sounds like the hold up is they have been unable to secure air rights from the building next door, as the crane needs to be able to swing slightly over the building.
Apparently the matter is being taken to court.
I guess. There have been a few though - you'd think it would be roughly the same as going to court though, especially if you lose the court case.@westcoastjos Not all builders have access to one. I don't think there are a lot of them available in Edmonton in general.