Nov 5
Had a look at the line today and will be some month before things are ready to say opening day is X with the summer being the target date at this time.
Humber station buildings have the Big T on them as well the signs on the street along with the ones at the stops. A few windows need replacing as they are shattered. Landscaping taking place.
Hwy 27 partly rebuilt as well Humber College Blvd. .Sidewalk on the westside of Hwy 27 with asphalt path on the east side for cycles and pedestrians. Still a lot roadwork to be done on Finch as well the cycle path
The stations themselves have a lot of work to be on on them as well.
Crews were working on 2 sections of track, otherwise complete with infill needed between the ROW and the road/stations along with the OS.
The OS got me on Hwy 27 as it is completely the Overhead Conductor Rail that is used in TTC St Clair West Station Loop from portal to portal, but normal coming out of the portal on Finch. This includes the 2 crossover tracks Heavy brackets support for the crossover tracks supporting the channel. What was also different there are no poles from the top of the hill to the station like the rest of the system to support the OS and they are mounted off the retaining wall bracket.
Did one video with the DSRL and a hard time keeping it on the dashboard and have yet to look at it.
It will be a few days before I get to today photos as I have a full plate in front of me for the next few days and night, but will post when I get to them.
If the talk about 2025 opening may have to due withe the cars themselves as they are the same ones as Ottawa. ML most likely waiting to see what is done to Ottawa cars and have the same fix apply to the Finch and Hurontario cars for they entre service. Mississauga was scheduled to see the first car either last month or this month, but expect to see it in 2024 as there is no OS in place to test it in the yard, let alone the test bed.