ViewerOfToronto
New Member
Here are the station interiors.
|
|
|
Love the red!Here are the station interiors. View attachment 557660View attachment 557661
I wonder if aside from road work (sidewalks, paving) they're waiting on better weather for?Seeing as they went from 99.16 to 99.33 in a month, can we assume this will be ready by August?
so it looks like the entire line for the most part is complete and ready to go pending final testing and training of operators.... far cry from the debacle that is line 5.UPDATE: There should be access to the April CLC now. Here’s the link. (hopefully it works)
Considering the track has now been certified for "Design speed train movement" they're now essentially at the meat and potatoes of the systems testing which they haven't communicated the progress ofso it looks like the entire line for the most part is complete and ready to go pending final testing and training of operators.... far cry from the debacle that is line 5.
I love this picture, and I've saved it for future arguments about bus vs. LRT capacity. (Largely for Hamilton where people still think just more buses will meet the needs of an over capacity bus line).Saw this in the CLC, just to give a perspective of how much bigger the lrt is compared to a bus.
View attachment 557714
I love this picture, and I've saved it for future arguments about bus vs. LRT capacity. (Largely for Hamilton where people still think just more buses will meet the needs of an over capacity bus line).
You'd still need 1 60' bus to arrive at a stop every 100 seconds in each direction to attain the same capacity as 1 of these Alstom Citadis Spirit LRVs every 5 minutesAs much as these LRT’s are long… they’re not too wide I side. Because the floors are low for accessibility reasons; a lot of the seats sit in what are called boggie boxes. Which mesns they’re sort of raised up inside with sometimes narrow aisles.
You are saving 2 buses and 7 drivers for each tram.You'd still need 1 60' bus to arrive at a stop every 100 seconds in each direction to attain the same capacity as 1 of these Alstom Citadis Spirit LRVs every 5 minutes
I’m pretty sure the ends are the same but there are two types of middle sections. A long and short. And I’m pretty sure you can add another long segment between the short section and an end.You are saving 2 buses and 7 drivers for each tram.
Once the ridership exceeded the 5-minute schedule, you reduce the headway until you need to add a second car that will save more buses and drivers.
Yes, Wikipedia suggests that the Finch vehicles are configured as cab + intermediate + long + cab and will have a capacity of between 300 and 340, depending on internal configuration.I’m pretty sure the ends are the same but there are two types of middle sections. A long and short. And I’m pretty sure you can add another long segment between the short section and an end.
According to Alstom back in 2008, you add I section to the car, but can the existing platforms handle them?I’m pretty sure the ends are the same but there are two types of middle sections. A long and short. And I’m pretty sure you can add another long segment between the short section and an end.