Noticed that my post about the Gage GO station in Hamilton (listed in the longer version of Metrolinxs' list) wasn't moved here.
Perhaps this thread is only for the shortlist, however, I thought this will be interesting as it is shortlist material (if it weren't for difficulties extending electrification into Hamilton at the moment). As Toronto needs to visit Hamilton's stadium more easily:
So here it is an updated version moved here:
The City of Hamilton purchased land near the GO station in the preliminary list by Metrolinx. It's land very close to the new stadium in Hamilton. Perfect place for an events platform. I've emailed Lee at Metrolinx to let him know.
It's not in the shortlist mainly because they're only looking at infills up to Aldershot for this current 10-year RER cycle. However, an infill between West Harbour GO and Stoney Creek GO will eventually be needed someday, especially if electrified RER is extended from Aldershot to Hamilton (say, in 15 years, perhaps, as RER Phase 2).
Also, local city councillor Sam raised a motion to do a Grey Cup at the Hamilton Stadium. To them, I
suggested that they build a cheap Exhibition-style unsheltered GO platform near the stadium. Apparently, Hamilton purchased land next to Gage on the railroad route between West Harbour and Stoney Creek. Matthew Green (my ward's councillor) is also
aware of this idea, from earlier. Originally the stadium was supposed to have been built at West Harbour, near the new GO station. However, while we
needed West Harbour over the long term anyway, the stadium wrong can be righted -- with another (albiet barebones) station.
The distance between West Harbour GO and Gage GO is actually bigger than the distance between Union and Exhibition GO. And at more than 3 kilometers, it's bigger than the typical infill station spacing! It would be worthwhile even without electrification, especially if this is an events-only platform (initially) like Exhibition GO was.
For less than $1M, a temporary unsheltered asphalt platform (to serve events only) could occur only on the south side of the tracks -- just like the first temporary Exhibition platform (it was also originally to serve events only too!). No shelter, no underpass, no overpass. Just a simple cheap platform, with ticket/Presto vending machines.
The land is now owned by the city (and, apparently, more land than the land used by West Harbor GO). City of Hamilton bought the old glass plant at Gage & Lloyd, which abuts into the railroad. It acted as parking for PanAm, and will be turned into soccer fields, but there's plenty of land to also fit a simple Exhibition-style pedestrian platform too -- without even sacrificing any planned soccer field.
In this case for a temporary events-only platform, no pedestrian overpass is needed, if a bidirectional siding is built to the south -- or possibly using rail they plan to install south of the CN trackage between West Harbour and Stoney Creek GO.
It is only 2-3 long blocks away from the new Hamilton stadium, a 5 minute walk.
Events include:
- TiCats football games
- Argonauts, whenever they need an alternate GTHA stadium
- Future Grey Cup (the motion raised by Sam)
- Future version of
World Music Festival at Gage Park (10-15 minute walk south)
Note: Since this was written, Lee has thanked me for flagging this to Metrolinx's attention -- their department may not have been aware that City of Hamilton now owns lands adjacent to the Gage GO station.