News   GLOBAL  |  Apr 02, 2020
 9.6K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.4K     0 

June 02
Kennedy GO
Part of the platform and 2nd track bridge partly built over the tunnel.
51223153447_30daa2a07f_b.jpg

51224074163_880e146ffe_b.jpg

51223153687_55bdc85dac_b.jpg

51224627269_c3a7fd29e3_b.jpg

51223861816_5f89089377_b.jpg

51224627124_7cca9a2904_b.jpg

51223152632_a320220db8_b.jpg

51224626969_bc15e6c21c_b.jpg

51224073123_c042af10c9_b.jpg

51223860796_49043c972b_b.jpg

51223151877_ac6c7e5f38_b.jpg

51223151817_20a079efae_b.jpg

51224072123_730a691bff_b.jpg
 
Where is the second track?
It will be to the left of the current one once the new platform is built for it. It will be in the same location where it was before the expansion. Don't expect to see the 2nd track in place until 2022
 
Maybe this is the wrong place to ask this, but whatever happened to the West Harbour third platform, Confederation GO, and Grimsby GO projects?
 
Maybe this is the wrong place to ask this, but whatever happened to the West Harbour third platform, Confederation GO, and Grimsby GO projects?
Great Question... I have nothing.

Confederation was supposed to be done in 2021, well uh, nothing even remotely resembling shovels hitting the earth has happened yet...
 
Maybe this is the wrong place to ask this, but whatever happened to the West Harbour third platform, Confederation GO, and Grimsby GO projects?
I have seen nothing related West Harbour third platform, Confederation GO 6 months ago other than doing track grading east of the bridge for Confederation a year ago.

Most likely delay due to COVID-19 and lack of ridership or flying under the radar these days. Since there is no NF trains these days, no need for a station to sit unused at wasted cost.
 
Great Question... I have nothing.

Confederation was supposed to be done in 2021, well uh, nothing even remotely resembling shovels hitting the earth has happened yet...

Hmmm, this tender went out in January:

1622841644248.png


I don't see where it was awarded; though I assume it would have been by now.
 
^I have a suspicion that the West Harbour work will be managed by CN, so may not turn up in the ML bid process.

But, as noted, Covid may have dropped the priority somewhat.

- Paul
 
Speaking of the City and Mx...............yet another motion at this meeting seeks to give Mx a hardtime; this one from Councillor Fletcher, seeking to bump up the Don Valley Storage Facility to a Federal EA.

Clearly not a City decision, it would be a City request to the Feds.

I doubt very much that this would qualify for federal intervention..................

Motion Link:


Substance from same:

View attachment 324816
I don't know why they don't use the Leaside yard. Bring the existing track out of disrepair, shift CP tracks to the north on the rail corridor, and put in the tracks for a yard. Use the old station for crew. You probably wouldn't even need an EA because it is using what was already approved long ago and what is still there but needing repair.
 
^Leaside is a far better location for a layover yard.

I doubt that a federal EA will make any difference to that.... an EA doesn’t ask if an idea makes sense, all any EA can do is identify impacts and outline mitigation needed.

- Paul
 
June 2
Finally got around to look at the Lawrence Ave Area.

You will be lucky to get an GO Platform in on the eastside of the Stouffville Line at Lawrence now. Only after the SRT is remove will you be able to put in a fully station there, then, you need a car to use the station and not much room for a parking lot

Notice the single mast is on the west side of track 2 and the northbound train turn it to red as it pass it.

Looking South
51226175909_a1cfe6b9a9_b.jpg

51224701352_cd635f8bd7_b.jpg

51225408586_8991f0ac55_b.jpg

51224701457_03df0234b3_b.jpg


Looking North
51226478345_6b61c1a3f0_b.jpg

51226478390_95fcc8d2c7_b.jpg

51225408786_a43aae35fc_b.jpg

51226478530_6abbc11661_b.jpg


From The Station
51223151412_bca47c7d88_b.jpg

51223151557_bc2304c06c_b.jpg

51224625929_de65b0d0cb_b.jpg
 
June 2
More up on site

Track being stall for track 2 at the north end. They have installed a roof over for both platforms sidewalk to Sheppard Ave including part of the stairs.
51224695832_8edd742e50_b.jpg

51226472330_928e1e1301_b.jpg

51225614458_1e44e537a6_b.jpg

51226170609_4e74141951_b.jpg

51226472850_4cb1d02cb3_b.jpg

51226171034_3d974034c8_b.jpg

51226472955_888cc7b187_b.jpg

51225403851_5a0fdcb913_b.jpg

51225403911_c2511b1d5f_b.jpg

51226473160_2df3e693f5_b.jpg

51226171369_1f26e16794_b.jpg

51226473310_65654e8206_b.jpg

51225615428_62fcfebdb5_b.jpg

51226171539_d979fa27f3_b.jpg

51225404396_657788868b_b.jpg


I am assuming that the 2 large tube columns are the base of a block signal mast or bridge that are south of the platforms in sight of the the train crew. They are in the walkway area
51225613983_a956953bbb_b.jpg
 
June 2
Finally got to tour the new Steeles underpass and do an update on Millikin Station.

As usual, cycles and pedestrians have to bear the brunt of being inconvenience in the name traffic coming first and this project is no exception. To go east on Steeles, one had to get off the Kennedy bus south of the bus stop as that whole block is seeing sidewalk and lane curb built to the point you must cross Kennedy to get to the west side to cross Steeles and then go east on the north side of Steeles a block. You then cross Steeles on the east side of the street to get to the unfinish south side to continue east. The cycling lane is not really open in places and plywood over the holes where trees will be planted at some point.

Going to miss getting photos and videos of fools who cross the tracks as the trains are arriving or departing the station with crossing gates down and flashing lights.

Still a lot of work to still be done on the south side and haft of the west retaining wall is in place on the north side.

Suppose to be 2 lanes going east and one west, but one of the eastbound lane close due to crews working in the road manhole. No real sidewalk or curb at the east end of the underpass.

Crews working on the west side tunnel and stair/elevator that has yet to see wall forming. Good area to get to the east side stair/elevator.

Still have a fair amount of roadwork and soon to be built retaining wall on the east side for the westbound lanes and sidewalk.

Very little has change for the station other than more roofing over the platform and the new west side stair/elevator area nearing the surface. Still nothing done for the east elevator going on 2 years. No work on the west new platform.

Summer of 2022 can't come fast for the completion of this project

Lot more photos up on site.
51225615793_890a9f6aab_b.jpg

51226171949_a26cc96e21_b.jpg

51225616068_04e5528195_b.jpg

51226172304_3dd5da6eaf_b.jpg

51224698022_e67fcdd5e0_b.jpg

51225616933_4eaf8cda1b_b.jpg

51226474960_4d64f001e4_b.jpg

51226173254_3a8ee47522_b.jpg

51226475450_ac79289270_b.jpg

51225617473_8b3068c2a7_b.jpg

51226173494_e812892512_b.jpg

51224699167_122600640b_b.jpg

51226174024_8cd7b45676_b.jpg

51225618078_1ed2975ef7_b.jpg

51224699637_e12386edf8_b.jpg

51226175834_16435f2808_b.jpg

51224699927_ee70be2bff_b.jpg

51224699977_ec3d3c5bbc_b.jpg

51226174959_057ab643e0_b.jpg

51226175784_a4f44a769d_b.jpg
 

Back
Top