rdaner
Senior Member
Corrected
|
|
|
If this construction notice is accurate, the third track would connect near the Mary Street pedestrian bridge, about 500 metres from the end of the platform.Thanks. I'm still curious as to how far the third track will actually go before merging back into the CN tracks. It looks like it's going to extend more than just a few metres.. but how far exactly?
My 2nd shot is from Mary Street bridge that shows the 3rd is going further east of it as well pass Ferguson Ave overpass, but could be wrongIf this construction notice is accurate, the third track would connect near the Mary Street pedestrian bridge, about 500 metres from the end of the platform.
View attachment 526099
Is the plan to have this stretch similar to the Lakeshore East setup from Pickering to Oshawa? Or is there no room for Metrolinx to run parallel , dedicated tracks?My 2nd shot is from Mary Street bridge that shows the 3rd is going further east of it as well pass Ferguson Ave overpass, but could be wrong
Original plan was an entirely new track for GO between West Harbour and Confederation. Evidently that wasn’t needed, and they’re just doing the tie in track. That corridor isn’t that busy, and if local freights can stay out of the way of GO trains it will be fine.Is the plan to have this stretch similar to the Lakeshore East setup from Pickering to Oshawa? Or is there no room for Metrolinx to run parallel , dedicated tracks?
At some point in the future, a 3rd track/siding for both systems will be require once headway start to fall and get to 15 minutes.Original plan was an entirely new track for GO between West Harbour and Confederation. Evidently that wasn’t needed, and they’re just doing the tie in track. That corridor isn’t that busy, and if local freights can stay out of the way of GO trains it will be fine.
I do hope upgrades to the existing tracks and crossings occur so trains can go faster, though.
Not a clue. We only heard about it the first time the other day. I’m sure Metrolinx will just expropriate whatever is needed.regarding OnCorr’s use of Obico for GO Expansion - are the staging tracks they will use owned by TTC now or a part of the former yard not included in TTC’s acquisition?
No. The main Obico facility was separate from the small yard adjacent to the Canpa Sub.regarding OnCorr’s use of Obico for GO Expansion - are the staging tracks they will use owned by TTC now or a part of the former yard not included in TTC’s acquisition?
4 fare enforcers got off the northbound train and were writing tickets for a few riders. They had to hang around until the southbound was to arrive some 30 minutes later.
I think it might have to do with the new trains they MIGHT be getting that COULD have platform level boarding..i still find it stupid that ML didnt bother to revise their standards for the raised wheelchair platform portion to be flush with the platform edge for tracks they use exclusively.
there is no fear of freight trains being too wide for it and its just so 1900s to need to drop a metal board to bridge the gap every singe stop.
What's crazy is that even if GO finishes electrifying some of the lines, They'll have to rip up these station platforms just to have them be level platform ready.I would say GO is absolutely committed to level boarding.....one day.
Just about every lamp post and curb in those pictures are clearly future proofed for level boarding.
I just don't get how people can believe that GO can say "OK, let's do level boarding" and wave a magic wand and make it happen over night. It will be a major construction program (think new drawings for every inch of GO platforms just to tender the work and manage the details....never mind the construction impacts....every platform having to go through a "doors will only open in cars a-f" period, and CSA's having to remember which station has what loading platform and all that....)
It makes absolutely no sense to start that program when GO has so many transitions and so much other construction going on. Clearly, level boarding can wait. Our children will be glad when it happens, and I'm sure it will.
Right now, we need other things more.
- Paul
Not rip up, add.What's crazy is that even if GO finishes electrifying some of the lines, They'll have to rip up these station platforms just to have them be level platform ready.