crs1026
Superstar
It's 3-4 tracks to just before Dixie GO. And then 2 tracks to Cooksville, and 3 again to north of 403. And then 2 tracks to Guelph Junction. After that it's only 1 track. I'm not sure how they can manage operation on one track (including the presumably heavier-used Toronto to Montreal track) elsewhere, but need to clear a 3-hour window for the occasional passenger run. If they run to Meadowvale, they can easily run a single train, every 2 hours.
I've seen some stations unstaffed and locked stations when trains are running. And have never seen staff at the station.
Every GO train needs to cross over across the freight path. With longer trains, there are only a few places on the line where freights can be held even for a few minutes to weave GO and opposing freights. It’s just not the same operating environment that it was when the service began.
I’m not saying it’s impossible, but we should not underestimate the impacts, which are real. They are substantial enough to encourage CP to play it safe. If I had a boss in Calgary who was watching my metrics on freight dwell and velocity, I’d be playing it safe too.
- Paul