LOL; you just threw it out there so casually I didn't instantly make the connection. Though the thought crossed my mind as I was posting.
I'd appreciate that. I hadn't heard that discussed. I have heard a goal of every 5M peak from Oakville and 10M off-peak being bandied about.
3M (presumably peak) is a big number through Burlington.
They currently have 3 tracks to Burlington, but cut off improved off-peak at Oakville.
I assumed that was a rail congestion issue w/CN.
@smallspy and
@crs1026 would doubtless know better.
In saying as much, I will ask, how congested are the tracks west of Oakville and what would Mx have to do to make 3M service to Burlinton possible?