I drive this way almost daily - its taking forever!
|
|
|
NoneHow much of that is due to utilities being slow?
Welcome to the world of delays brought to you by Toronto Hydro. Toronto Hydro is famous for being late by weeks to an year for most projects and this just one of 100's related to TTC projects. Now why is it TTC is very slow as well the contractor for not having the New ROW built by now??I drive this way almost daily - its taking forever!
No doubt they have it in their snow-clearing contract so no possible way it could NOT be salted!Over the last few days, I observed TTC a service truck salting the Queensway right of way west of High Park, and a second TTC pickup driving on said row. Pretty odd considering the line is not in service, and the Queensway roadway was cleared fairly well during the storm.
Hate to see salt used at all on these tracks - has to be a life shortener for these almost-new rails.
Maybe TTC ought to just leave the snow in place and let people ski/snoeshoe along the line… it won’t see streetcars any time soon.
- Paul
Early to mid Q2 should be the latest it would reopen 100% based on what I have seen first hand. When a few surprises show up, it tends to delay things as noted that can be based on no info was every put on record for it or it was have the wrong correct info for it.This project is an absolute gongshow of an embarassment all around for all parties involved, wouldnt be surprised if this isnt finished until the end of the year at this point.
Don't worry there are more closures for this year and next coming up. Though the might not affect this part of the lineI dont think i have seen streetcars at parklawn/lakeshore since 2018 now... its been a while
Well, if Park Lawn Loop is to be in place by 2026, the the Lake Shore ROW has to be built in which means the widening of Lake Shore to allow for switches installation or it could be in 2026. 507 streetcars will start running again later this year and until the Lake Shore ROW work takes place. 501 streetcars will run to Sunnyside loop once TTC opens it up hopeful by February or early March.I dont think i have seen streetcars at parklawn/lakeshore since 2018 now... its been a while
When I passed by today the Eastbound lanes were paved and being used by vehicles. The ROW now has construction barrels to block entry. The left turn lane is being used to store fencing for now, but that's fine since Roncesvalles northbound is no where near ready to open.As I noted in my last posting, paving is holding up the reopening of the eastbound lanes and don't know what the city standard is for paving at this time of the year. That said, cars can drive on the concrete now and use the ROW in the spring while the road is pave if it can't happen now.
Overhead wire is no longer missing at Sunnyside loop and is present through the whole loop. However, it is not all on proper hangers yet and is being held up with rope/string in multiple places.Sunnyside loop is ready for service once TTC finishes the last of the string of the missing OS and does the normally testing before putting x back into service. Feb should see it in service from my point of view.
Wow so in the end it very well could be closed for most of a decadeWell, if Park Lawn Loop is to be in place by 2026, the the Lake Shore ROW has to be built in which means the widening of Lake Shore to allow for switches installation or it could be in 2026. 507 streetcars will start running again later this year and until the Lake Shore ROW work takes place. 501 streetcars will run to Sunnyside loop once TTC opens it up hopeful by February or early March.
Once the rest of the ROW is built to Parkside Dr, streetcars can return to both 507 and having 501 streetcars going to Humber until the next cut in 501 line takes place.
On Dec 18, I shot the switches being put together already on the base and tearing up existing tracks north of the east gate. I saw no issues for the new trackwork. I thought shot this area in Nov and maybe the area they were tearing up was the surprise area.When I passed by today the Eastbound lanes were paved and being used by vehicles. The ROW now has construction barrels to block entry. The left turn lane is being used to store fencing for now, but that's fine since Roncesvalles northbound is no where near ready to open.
Overhead wire is no longer missing at Sunnyside loop and is present through the whole loop. However, it is not all on proper hangers yet and is being held up with rope/string in multiple places.
How long has the Park Lawn Loop been on the book for the south west loop to see how slow things get done for transit in TO. That now has been move to the north east area and subject to the developer timeline.Wow so in the end it very well could be closed for most of a decade