News   GLOBAL  |  Apr 02, 2020
 11K     0 
News   GLOBAL  |  Apr 01, 2020
 43K     0 
News   GLOBAL  |  Apr 01, 2020
 6.7K     0 
Slowest project slowly emerging from the ground. 84th Ave and 91 St. It took since April to get to this point.
20251007_175152.jpg
 
Stunning start though. I live on 84 Ave on the other side of Bonnie Doon. Can’t wait to the planned road through the mall property on 84 ave. Seeming less likely lately though.
 
They're not demolishing it, are they? Can I assume if that were the case, they'd have just smashed it to smithereens?
 
They're not demolishing it, are they? Can I assume if that were the case, they'd have just smashed it to smithereens?
Home Improvement Permit
Reference Id:Job No 520408831-006
Description:To construct an addition, interior, and exterior alterations to a Single Detached House (add new attached Garage, unenclosed side porch, attached rear shed, alterations and finishing material changes to dormers on north and west sides of roof, façade changes, Basement development (NOT to be used as an additional Dwelling), sunken patio, and landscaping changes in south Side Yard).
Location:9905 - 115 STREET NW
Plan NB Blk 14 Lots 32-33
Applicant:RESCOM CONSTRUCTION MANAGEMENT INC.
Status:Issued
Create Date:2024/07/23
Neighbourhood:WÎHKWÊNTÔWIN
 

Back
Top