aquateam
Active Member
Taking the above points individually:
- "Standing Room" is hardly an indicator of crush capacity
- The cost of such a small bespoke fleet may indeed be significant in the long term
- At least having a ballpark price on full length platforms, especially going into any serious look at extensions, makes a lot of sense
- I fear that extending the platforms now is more a prelude to through routing with Line 2 than anything else
Doesn't the SSE to Sheppard preclude the through-routing with Line 2? I remember there was a push for the "Big Bend" proposal, which would have turned Line 2 towards Sheppard, but that was back when it was a single-stop "Express subway."
So if I mash together all the various interlines folks have been bringing up I get something like this... Anything missing?
View attachment 277883
Maybe try adding the Flying U and a YUS loop next?
You forgot to add the DRL and its extension to Sherway to meet up with Line 2.