robmausser
Senior Member
What's' the point of extending it at a difrent gauge? Also why would you want to waste money regaugue the existing line?
Because theres an associate cost savings, however minor, with sticking to standard gauge. Both in the near and long term.
Ontop of that, it would not be a waste to regauge the existing line, the tracks will need to be replaced come 2035, and so you'd just change the gauge when retracking was done.